Challenge
Leaves and debris had packed under the lead flashing and blocked the gutter behind it, and the joint between the lead and the stepped flashing needed re-sealing.
A blocked lead-lined gutter cleared, the seam torch-welded at the outlet and the flashing joint sealed, worked off the scaffold already standing.
Project context
Building described without naming the client. Delivered from the contractor's existing scaffold, with no additional access cost.

Leaves and debris had packed under the lead flashing and blocked the gutter behind it, and the joint between the lead and the stepped flashing needed re-sealing.
Full scaffold was already standing to the elevation, so we worked off the existing platforms rather than adding access cost. We cleared and degreased the lead, torch-welded the seam alongside the outlet, then dressed the joint with a black bituminous sealant and finished the run with patination oil.
The gutter runs clean and continuous along the cornice again, with an even tone across the repaired lead.




Use the contact or quote page to share your building type, access issue, or inspection requirement. Innova can then advise on a practical delivery route.