Challenge
Construction works had left the rear elevation coated in cement dust that had bonded into the glazed tiles, and conventional cleaning would not shift it. The elevation faces a narrow alley between buildings with no room to erect scaffolding or stand a MEWP, and all of it had to happen inside a live tier-one construction site to the main contractor's programme.